Getting ready for Baltic 2
The Baltic 2 wind farm, formerly known as Kriegers Flak, is the second German offshore wind farm to be built in the Baltic Sea. It will ultimately incorporate 80 wind turbines with a total generating capacity of 288 MW.
Posted on: 01 November 2014
with
0 comment(s)
Tags: 2, Balfour, baltic, Beatty, dc, farm, insulation, resistance, tdr, test, vlf, wind