Menu

Technical

Technical documents for the BITE2 and BITE2P

Filter by application type:
    Showing item(s) 1 - 2 of 2 in total
NERC Testing with the BITE2
In 2007 FERC approved 83 NERC (North American Electric Reliability Council)   Reliability Standards, the first set of legally enforceable standards for the U.S. bulk power system. Compliance with approved NERC Reliability Standards is now mandatory and enforceable in the United States.
Published: 6 November 2019
Download PDF
Battery inter-cell resistance measurements
This document discusses the nuances of inter-cell connection measurements, as well as best practices for the entire measurement process. Included are diagrams outlining the measurement structure so that you get consistently reliable results.
Published: 2 November 2017
Download PDF